Technically Unfeasible

Technically Unfeasible

Cry Wolf Quotes

In our opinion, an incalculable and insupportable cost would be required to reduce emissions to the [two] fiber level....it would take considerably more than two years to attain such levels if in fact, they could be reached at all.

-
GAF Corporation comment, no specific author.
03/14/1972 | Full Details | Law(s): OSHA's Asbestos Standard

As the dust would be ubiquitous, complete vacuum cleaning of a posted construction would be a daily occurrence. This monstrous task would be a nightmare and totally unfeasible. Alternately, enclosures to capture dust are equally unfeasible.

-
Thomas J. Gryl, National Safety Director for Brand Insulations Inc.
02/11/1972 | Full Details | Law(s): OSHA's Asbestos Standard

Let me state, first, that achievement of a standard of 2 fibers per cc is not, at the present time, technically feasible in all areas of our manufacturing operations. Thus, I cannot estimate fully the total final economic impact on our business, or the total final capital investment required.

-
Edward J. Killian, Vice President for Manufacturing Operations, Gold Bond Building products.
03/14/1972 | Full Details | Law(s): OSHA's Asbestos Standard

The proposed limit of two fibers...is impossible to meet....The cost of attempting to reach such a low limit would be astronomical and entirely unrealistic....The added expense would definitely force us out of business and would entail the loss of hundreds of jobs.

-
John L. Rainey, President of the American Asbestos Textile Corporation.
03/15/1972 | Full Details | Law(s): OSHA's Asbestos Standard